Frequently Asked Questions
Shed Installation
What base do I need for my garden shed? Is it okay to put my shed on the grass or soil?
The vast majority of garden sheds sit on concrete blocks which are placed directly onto grass or soil
which works great for the average garden shed. Please note that concrete blocks are included in the price of your shed.
The blocks will keep the wood from touching the ground and will allow air to circulate under the shed. This option
offers great advantages as it will save you the cost of constructing a concrete base and is more convenient if you need
to relocate the shed in a few years’ time.
Do I need a concrete base for my shed?
A concrete base would be ideal, but in reality the vast majority of garden sheds sit on concrete blocks
which are placed on grass or soil. In most cases, this will work perfectly. However, if you are purchasing a very large
shed or you intend to put a lot of weight into it, then you should consider putting it on a concrete base or at least a
hardcore stone base. In doing so, you will prevent the shed from sinking or moving. If it moves or sink on one side or
corner, it will cause the shed to twist and may push the door out of line.
I have a concrete base. Do I still need blocks underneath my shed?
Yes, it’s still a really good idea to put blocks under the shed because it allows air to circulate
underneath which extends the life of your wooden shed floor.
Do I have to extend the concrete base?
A full concrete base is the ideal solution, but for the average garden shed it is not necessary to
extend it. We can simply place some blocks on the concrete base while building up blocks on the lower ground to support
the shed at an even level. However, if you intend on putting heavy items in the shed then extending the concrete base
would be the best option.
What happens if the site for my new shed is not level?
If your site is slightly uneven, we can usually fix this quite easily with some extra packers on top of
the blocks. However, if the site is very low on one side we can build it up using additional concrete blocks to ensure
that the shed will be level. It’s important to note that these blocks will be visible. In this instance, our customers
often decide to hide the blocks at a later stage by either raising their garden or camouflaging them with shrubs or a
timber panel. If your garden is very sloped or uneven, it may be necessary to level the area before ordering your shed.
If you are unsure or concerned, please send us a photograph of the proposed site and we can advise you on this. When
taking the photo, if possible include a fence or a wall in the background to give us an idea of the scale and include
the size of the shed you are planning to purchase.
Why do I need a level site?
It’s important that your new shed sits level otherwise over time the walls will twist and the door will
go out of line.
Do I have to be there when the shed is being installed?
Yes. It is necessary that someone responsible is present to instruct our team on the exact desired
location of the shed.
How long does it take to install my new shed?
It will usually take less than two hours to install an average size garden shed.
Can you take away my old shed?
Yes, we can take your old shed down and dispose of it in the correct environmental manner for an
additional cost. As a guideline, it costs €175 to remove the average size garden shed. Please call us for an accurate
quote. It’s important to note that we will only take away the bare shed and cannot dispose of any contents in addition.
The shed must be completely empty before we arrive. If you would like to clear away any other unwanted items it may be
useful to consider hiring a skip and disposing of everything at once, including your old shed.
I have electricity in my old shed. Can you disconnect it?
No, this work must be done by a registered electrician. All the wires must be completely removed from
the shed before we arrive.
Can you put electricity into my new shed?
No, this work must be done by a registered electrician.
Answer
Answer
Answer